Another great example of Caledonia’s innovative thinking. By utilising pre-built craneable modules, the overall cost of this project was reduced by over $750,000! Modules were designed and engineered in-house, then craned into position, allowing for a reduced number of site-based scaffolders in addition to a much smaller real estate footprint; essential for the overall efficiency of the build process.
The outcome was an effective build that came in under both time and budget.